New
RBI Grade B 2023 Notification to be out soon; Get ready !!!!
Login
Register
More Topics
Home
Questions
Quantitative Aptitude
Time
Practice Time Questions and Answers
Question Listing
A mobile plan costs Rs.32 for 6 minutes. What is the approximate cost, rupees, for 4 minutes?
3 men dig a hole in 10 days. How many days would it take for 5 men to dig the same hole ?
Hema takes a total of 9 hours 55 min to walk a certain distance and then cycling back to the same place from where she had started. She could walk both way...
Two cars start from a house at an interval of 10 minutes and travel at a speed of 20 km/hr. With how much speed (km/hr.) should a woman coming from the opp...
A can complete a certain work in 30 days. B is 25% more efficient than A and C is 20% more efficient than B. They all worked together for 3 days. B alone w...
Girish can paint a picture in 4 days when he works for 8 hours per day. Due to illness, he could work for only 6 hours per day and was required to finish p...
Four bells ring at 16, 24, 36, 42 minute intervals. If they ring together at 6.00 a.m., after how long would they next ring together? ...
A trip from Mumbai to Pune takes 4 hours 30 minutes at a speed of 60 km/hr. How long (in hours) will it take to complete, if the speed is 15m/sec?
'K' can do 3/4th of a work in 6 days and 'J' can do 2/5th of the same work in 4 days. How long (in days) will they take, if they work together to finish th...
A, B and C can individually complete a piece of work in 24 days, 15 days and 12 days,respectively. B and C started the work and worked for 3 days and left....
Working together A and B can do a job in 40 days, B and C in 36 days and all three together in 24 days. In how many days can B alone do the job?
A, B and C can do a job working alone in 50, 75 and 20 days respectively. They all work together for 4 days, then C quits. How many days will A and B take ...
A can do 50% of the job in 16 days, B can do 1/4th of the job in 24 days. In how many days can they do 3/4th of the job working together?
A and B can together complete a task in 18 hours. After 6 hours A leaves. B takes 36 hours to finish rest of the task. How many hours would A have taken to...
A and B can complete a task in 25 days. B alone can complete 33 1/3 % of the same task in 15 days. In how many days can A alone complete 4/15th of the sa...
A, B and C can do a work in 8, 16 and 24 days respectively. They all begin together. A continues to work till it is finished, C leaving off 2 days and B on...
A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 12 days, and C alone in 24 days, in what t...
Two workers A and B working together completed a job in 5 days. If A worked twice as efficiently as he actually did and B worked 1/3 as efficiently a...
Three bells ring at interval of 36 seconds, 40 seconds and 48 seconds respectively. They start ringing together at a particular time. They will ring togeth...
A man can do a piece of work in 30 hours. If he works with his son then the same piece of work is finished in 20 hours. If the son works alone he can do th...
What % of a day is 30 minutes ?
A person from the top of a hill observes a vehicle moving towards him at a uniform speed. It takes 10 minutes for the angle of depression to change from 45...
A man on the top of a tower, standing on the sea-shore, finds that a boat coming towards him takes 10 minutes for the angle of depression to change from 30...
A and B can do a work in 21 days, A is (7/4) times as efficient as B. In how many days, A alone can complete the (100/3)% of the work?
A can finish the work in 40 days and B in 30 days. They both work together for 5 days and then B leaves. How many days will A take to complete the remainin...
A flight has to travel between 2 cities A and B, 2000 km apart. The flight was slowed down due to bad weather. Its average speed for the trip reduced by 20...
Pipe A can fill the tank 5 times faster than pipe B, if pipe A and B together fill the tank in 50 minutes, then pipe B alone can fill the tank in:
A and B can do job in 10 days. B and C can do same job in 12 days. A, B and C together can do same job in 8 days. In how many days A and C together can com...
A and B can finish a work working on alternate days in 19 days, when A works on the 1st day. Similarly, they can finish the work working on alternate days ...
A and B can complete a work together in 36 days. If A alone can complete one-fourth of the work in ‘x’ days and remaining work is completed by ...
A and B alone can complete a work in 30 and 60 days, respectively. 50% of the work is completed by C in 6x days, and the remaining work is completed by A a...
A started a work such that he can complete the whole work in 30 hours. After working for 10 hours, he worked with the rate such that the whole work can be ...
A’ and ‘B’ together can complete a work in 8 days, while ‘B’ and ‘C’ together can complete the work in 12 days. I...
A and B together can complete a piece of work in 35 days while A alone can complete 50% of the work in 20 days. Find the time taken by B to complete 12.5% ...
A is thrice as efficient as B and can finish a piece of work in 28 days less than B. B can finish this work in how many days?
Working alone, B can complete the work in 20 days. C is twice as efficient as B and A takes 2 days more than it takes C to complete the work. Working toget...
An elephant can do a work as fast as two horses ‘A’ and ‘B’ can do it by working together. If horse ‘A’ alone can compl...
Harish and Bimal can complete a task in 20 days. They worked at it for 15 days and then Bimal left. The remaining work was done by Harish alone, in 10 days...
A mango kept in a basket doubles every one minute. If the basket gets completely filled by mangoes in 30 min then in how many minutes half of the basket wa...
Page 1 of 2
Previous
1
2
Next
Last ››
More Topics
Ă—
Addition & subtraction
Age
Algebra
Alligation
Approximation
Arithmetic Progression
Average
Bar graph
Binomial Equation
Boats and streams
Calculation based
Caselet DI
Circle
Clock and Calendar
Compound Interest
Coordinate Geometry
Cube & cube roots
Data Sufficiency
Databased
Databased Partnership
Databased Profit Loss and discount
Databased Ratio
Databased Time and Work
DI
Di Bar Graph
DI Line Graph
DI Pie Chart
DI PIE Chart and Ratio Table
DI Tables
Di With Missing Numbers
Differential Equation
Discount
Divisibility rules
Equality and Inequality
Equations
Fractions
Geometry
HCF and LCM
Height and Distance
Income and Expenditure
Integration
Limits and Continuity
Line graph
Linear Equation
Lines and Angles
Maxima and Minima
Mensuration
Missing DI
Mixture
No. System
Partnership
Percentage
Permutation and combination
Pipes and cisterns
Polygon
Probability
Profit and loss
Quadratic equation
Quadrilateral
Quant Miscellaneous
Quantity Inequality
Radar graph
Ratio
Ratio and proportion
SI and CI databased
Simple and compound interest
Simplification
Square & square root
Surds and indices
Time and distance
Time and work
Trains
Triangle
Trigonometry
Uniatry Method
Weekly Quiz Quant
Wrong Series
Today's Class
There is no live class for today.
×
I Pledged to:
callback wala button
×
Please Enter Details
Please enter Name
We'll never share your email with anyone else.
Please enter Correct Mobile Number
We'll never share your email with anyone else.
Request a Call Back
Thank You
Update Address
Please enter complete address
Please enter pincode
Please enter State
Select State
Please enter City
Add Address
X
×