Question
An elephant can do a work as fast as two horses
‘A’ and ‘B’ can do it by working together. If horse ‘A’ alone can complete the work in 40 hours and horse ‘B’ in 60 hours, then find the time taken by elephant to complete the work.Solution
Let the total work = 120 units Efficiency of horse who can complete the work in 40 hours = 120/40 = 3 units/hour Efficiency of horse who can complete the work in 60 hours = 120/60 = 2 units/hour Therefore, time taken by both horses to complete the work together = 120/(3 + 2) = 24 hours Therefore, time taken by the elephant to complete the work = 24 hours
This soil property which impacts nutrient movement to plant roots through mass flow and diffusion?
The test to confirm presence of Sesame oil in Vanaspati in sufficient quantity as per regulations is:
Paddy and straw are an example of
Which of the following act as a regulator of agricultural produce market?
In which year did tractor manufacturing start in India?
According to CRIDA, the depth of deep tillage is ____
The daily dietary nutrient intake level that is sufficient to meet the nutrient requirements of nearly all healthy individuals is called:
The cholesterol content of food given in the Indian Food Composition Tables is determined by:
Maximum, minimum and optimum temperatures are collectively termed as
Irrigation is scheduled at IW /CPE ratio of 0.8 and the crop is irrigated to a depth of 5.0cm when the CPE is-