Question
Working alone, B can complete the work in 20 days. C is
twice as efficient as B and A takes 2 days more than it takes C to complete the work. Working together, in how much time would they be able to complete 7 such works?Solution
Time taken by B to complete the work = 20 days Time taken by C to complete the work =20/2 = 10 days Time taken by A to complete the work alone = 10 + 2 = 12 days Work done by A, B and C together in 1 day. ⇒ (1/20+ 1/10 + 1/12) = (3 + 6 + 5)/60 = 14/60 this means if would take 30/7 days for A, B and C to complete the work together ∴ Time taken A, B and C to complete 7 works = 7 × 30/7 days = 30 days
Which of the following is an example of telecommunication?
In which of the following topology, each node is connected to exactly two other nodes forming a single continuous pathway for signals?
Which of the following is not a type of operating system?
PDAs are also called _______ computers.
The OSI model's Presentation Layer is responsible for:
What type of operating system switches tasks based on their priorities or external events?
Which layer of the OSI model is responsible for error detection and recovery?
How can the capacity of a CPU be measured?:
__________ characteristics is used to compute dynamically the results from Excel data.
Which company makes the Windows operating systems?