A can complete a certain work in 30 days. B is 25% more
efficient than A and C is 20% more efficient than B. They all worked together for 3 days. B alone will complete the remaining work in:Solution
A can complete the work in = 30 days Efficiency of A (A’s 1 day’s work) = 1/30 Efficiency of B (B’s 1 day’s work) = 1/30 × (125/100) = 1/24 Efficiency of B (B’s 1 day’s work) = 1/30 × (125/100) = 1/24 Efficiency of C (C’s 1 day’s work) = 1/24 × (120/100) = 1/20 Let the remaining work be complete by B in x days. According to the question, => 3(1/30 + 1/24 + 1/20) + x/24 = 1 ⇒ 3 [(4 + 5 + 6)/120] + x/24 = 1 ⇒ 15/40 + x/24 = 1 ⇒ x/24 = 1 – 3/8 ⇒ x/24 = (8 – 3)/8 ⇒ x/24 = 5/8 ⇒ x = 5/8 × 24 = 15 days
Seven persons S, T, U, V, W, X and Y live on different floor of a seven-storey building. The bottommost floor is numbered as 1 and the topmost floor is...
Seven persons, P, Q, R, S, T, U and V, live in a building, which has seven floors. The floor, which is at the bottommost position is numbered as 1, the ...
What may be the code of ‘when talent give work’?
Who shops in home décor department from Big Basket?
Which of the following box is placed immediately below box B?
Box C is placed from which of the following place?
Select the option that is related to the third number in the same way as the second number is related to the first number.
39 : 68 :: 54 : ?
Which of the following does not belong to the group?
How is M related to L?
Who likes Mango?Â