Question
A and B can do a work in 21 days, A is (7/4) times as
efficient as B. In how many days, A alone can complete the (100/3)% of the work?Solution
Let efficiency of B be 4 units/day Efficiency of A = 4 × (7/4) = 7 units/day We know, Total work = Efficiency × Time taken Total work = (7 + 4) × 21 = 231 units 100/3 % of the total work = 231 × 100/300 = 77 units A alone can complete 100/3 % of the work in = 77/7 = 11 days
Chemical formula of single superphosphate is:
FIRB method of planting is followed in which crop?
The substance that is added to make natural rubber strong and more bouncy is-
Soil incorporation of herbicide decomposed by sunlight should be done
A loan which is given for time period of 15 months and could be utilized for purchasing of seeds and fertilizers is known as__________
Cultivation of crops in areas receiving annual rainfall more than750 mm but less than 1150 mm is known as
Which irrigation method is suitable for cotton grown in heavy soils like clay and loam, reducing water usage by 50%?
The product of pedigree selection is
For green manuring sunhemp can be sown duringÂ
Extending over Rajasthan, West of the Aravalis, this region has an erratic rainfall of an annual average of less than 25 cm. Bajra, jowar, and mot...