Question
A and B alone can complete a work in 30 and 60 days,
respectively. 50% of the work is completed by C in 6x days, and the remaining work is completed by A and B working together in ‘x’ days. Find the time taken by B and C to complete the whole work while working together.Solution
Time taken by A and B to complete the whole work while working together = (30 × 60)/(30 + 60) = 20 days So, x = 20/2 = 10 (Since, 50% of the work is done by A and B together) As, time taken by C to complete 50% of the work = 10 × 6 = 60 days So, time taken by C to complete the entire work = 60 × 2 = 120 days Therefore, time taken by B and C to complete the whole work while working together = (120 × 60)/(120 + 60) = 40 days
- What is to be subtracted from (13/20) so that the result is (7/25)?
Determine the smallest four-digit number that is evenly divisible by 12, 22, and 42.
The arithmetic mean of two values βaβ and βbβ is 16, and their geometric mean is 10β2. Find the positive difference between the numbers, given...
A test consists of 20 questions, where each question is worth either 3 marks or 5 marks. The total marks for the entire test add up to 70. How many ques...
A monkey climbs a tower of height 60 m. It climbs 5m above in 1st minute and 4m below in 2nd minute. In how many minutes monkey wi...
If the sum of two positive numbers is 37 and the difference between these two numbers is 5, then what is the product of the two numbers?
Find the range of the given data:
14, 28, 35, 21, 42, 56, 49
If β+β means β-β, βΓβ means βΓ·β βΓ·β means β+β and β-β means βΓβ, then which of the following will be the value of th...
- The sum of two numbers is 801. When the larger number is divided by the smaller one, it results in a quotient of 41 with a remainder of 3. What is the diff...
- If 85% of a number is added to itself, the result exceeds the original number by 51. Find the final number obtained.