Start learning 50% faster. Sign in now
Time taken by A and B to complete the whole work while working together = (30 × 60)/(30 + 60) = 20 days So, x = 20/2 = 10 (Since, 50% of the work is done by A and B together) As, time taken by C to complete 50% of the work = 10 × 6 = 60 days So, time taken by C to complete the entire work = 60 × 2 = 120 days Therefore, time taken by B and C to complete the whole work while working together = (120 × 60)/(120 + 60) = 40 days
27% of 250 – 0.02% of 1000 is equal to:
(-251 × 21 × -12) ÷ ? = 158.13
(0.1 × 0.2 × 0.3) + (0.3 × 0.4 × 0.5) =?
1200% of 18 + √1600 + 62 = ?2 + (90 of 0.4)
1500 × 60% of 25% = ? 2
[(1245 ÷ 9) ÷ 12] × 540 = ?2 – 175
{(8× 8 + 3 × 39) - 620 ÷ 20} = ?
25% of 1000 + 10% of 150 – 22 × ? = 45
√441 * 7 – 10% of 250 + ? = 140% of 120
1885 ÷ 64.98 + 7.29 + ? = 69.09