Question
A’ and ‘B’ together can complete a
work in 8 days, while ‘B’ and ‘C’ together can complete the work in 12 days. If ‘B’ takes 20 days to complete the work alone then find the time taken by all three together to complete 47.5% of work.Solution
Let the total work = 120 units Efficiency of (A + B) = 120/8 = 15 units/day Efficiency of (B + C) = 120/12 = 10 units/day Efficiency of ‘B’ = 120/20 = 6 units/day Efficiency of (A + B + C) = (15 + 10 – 6) = 19 units/day Required time taken = (0.475 × 120)/19 = 3 days
Which method of plant propagation is commonly used for litchi?
What is the colustrum requirement for the new born calf on the basis of body weight    Â
When was the Central Warehousing Corporation established?
The headquarter of the National Centre of Organic Farming(NCOF) is situated at:
The time required to kill 90% of the microorganisms in a sample at a specific temperature is the
Acetyl CoA acts as connecting link between?
The bio â industrial watershed concept was given by
Globally India has been ranked ____ in terms of Oilseeds production
Bunchy top of banana disease is transmitted by
Which protein is responsible for elasticity of wheat dough?