Question
A’ and ‘B’ together can complete a
work in 8 days, while ‘B’ and ‘C’ together can complete the work in 12 days. If ‘B’ takes 20 days to complete the work alone then find the time taken by all three together to complete 47.5% of work.Solution
Let the total work = 120 units Efficiency of (A + B) = 120/8 = 15 units/day Efficiency of (B + C) = 120/12 = 10 units/day Efficiency of ‘B’ = 120/20 = 6 units/day Efficiency of (A + B + C) = (15 + 10 – 6) = 19 units/day Required time taken = (0.475 × 120)/19 = 3 days
Which of the following is the primary purpose of exploratory data analysis (EDA)?
Why is sampling a critical step in large-scale data analysis?
A developer is tasked with implementing a task scheduling system where multiple tasks with dependencies need to be executed. Which data structure would ...
A scatter plot reveals a strong positive linear relationship between two variables. Which of the following is the most appropriate statistical measure t...
Which format is best suited for organizing customer complaints recorded in text format, including emails and social media messages?
What factor primarily determines the minimum sample size needed for a survey ?
In regression analysis, which metric measures the proportion of variance explained by the model?
Which of the following sampling techniques is most suitable when the population is divided into distinct subgroups, and it is important to ensure each s...
In Python, missing values in DataFrame are represented as:
Which of the following is an example of metadata in a database?