Question
A’ and ‘B’ together can complete a
work in 8 days, while ‘B’ and ‘C’ together can complete the work in 12 days. If ‘B’ takes 20 days to complete the work alone then find the time taken by all three together to complete 47.5% of work.Solution
Let the total work = 120 units Efficiency of (A + B) = 120/8 = 15 units/day Efficiency of (B + C) = 120/12 = 10 units/day Efficiency of ‘B’ = 120/20 = 6 units/day Efficiency of (A + B + C) = (15 + 10 – 6) = 19 units/day Required time taken = (0.475 × 120)/19 = 3 days
This soil property which impacts nutrient movement to plant roots through mass flow and diffusion?
The test to confirm presence of Sesame oil in Vanaspati in sufficient quantity as per regulations is:
Paddy and straw are an example of
Which of the following act as a regulator of agricultural produce market?
In which year did tractor manufacturing start in India?
According to CRIDA, the depth of deep tillage is ____
The daily dietary nutrient intake level that is sufficient to meet the nutrient requirements of nearly all healthy individuals is called:
The cholesterol content of food given in the Indian Food Composition Tables is determined by:
Maximum, minimum and optimum temperatures are collectively termed as
Irrigation is scheduled at IW /CPE ratio of 0.8 and the crop is irrigated to a depth of 5.0cm when the CPE is-