Question
'Pooja' can complete a work in 28 days. She started the
work and left after 14 days from starting. The remaining work was done by 'Ritika' in 21 days. Find the time taken by 'Ritika' to complete 50% of the work.Solution
ATQ,
Fraction of work completed by 'Pooja' = (14/28) = (1/2)
Remaining work = 1 - (1/2) = (1/2)
Time taken by 'Ritika' to complete (1/2)th of the work = 21 days
Time taken by 'Ritika' to complete the whole work = 21 × (2/1) = 42 days
Therefore, time taken by 'Ritika' to complete 50% of the work = 0.5 × 42 = 21 days
Why exhausting is done in canning
a)Â Â Â To avoid the corrosion of tinplate and pin holing during storage.
b)Â Â Â To minimize dis...
Which of the following Additives are used in the manufacture of cheese?
Options:
1. Propionic acid
2. Calcium chloride
3. So...
Caramels are firm ______ candies and the added substance that may interfere with crystallisation are________
This highly alkaline substance neutralizes acidic chyme for enzyme action. It is called:
The thermal conductivity of food is influenced by
Vacuum-packaged meats are spoiled by:
(I) Bacteria
(a) 0.9- 0.95
(ii) Yeast
(b) Staphylococcus
(iii) molds
(C ) Entamoeba
(iv) Protozoa
(d) 0.7-0.8
Full-cream milk contains:
Fermentation of glycerol in wine results in_____
Which is not a proactive preventive approach to food safety?