Question
30 men can complete a task in 160 days. 12 men start the
work and manage to do half of it. Then, 18 more men are added to the team to help finish the work. Find the total duration required to complete the task.Solution
ATQ, Total amount of work = (30 x 160) = 4800 units Amount of work completed by 12 men = (4800/2) = 2400 units Time taken by 12 men to complete half of the work = (2400/12) = 200 days Amount of work completed by 30 men (12 + 18) = 4800 - 2400 = 2400 units Time taken by 30 men to complete 2400 units = (2400/30) = 80 days Total time taken = 200 + 80 = 280 days
Electrical fuse is used to interrupt excess of _________.
Which of the following statements best describes the relationship between static friction and the normal force?
Which Nobel Gas is also known as โStranger Gasโ?
The S.I. unit of the electric flux is
What type of image is always formed by a convex mirror?
The motion of a freely falling body is an example of ______________ accelerated motion.
Which of the following Instrument is used to measure humidity?
The Atom Bomb dropped in Nagasaki is an uncontrolled nuclear fission made up of:
The instrument which uses sound waves to measure the depth of oceans is โ
Mercalli scale is the instrument used for measuring the intensity of ___________.