Question
‘Pawan’, ‘Qureshi’, and
‘Ram’ can finish 50%, 1/3, and 3/4 of a job in 24, 18, and 54 days, respectively. If ‘Pawan’ and ‘Qureshi’ start the job together and work on it for 18 days, calculate how long ‘Ram’ will take to complete the remaining work alone.Solution
ATQ, Time taken by ‘Pawan’ to complete the whole work = (24/0.50) = 48 days Time taken by ‘Qureshi’ to complete the whole work = 18 × (3/1) = 54 days Time taken by ‘Ram’ to complete the whole work = 54 × (4/3) = 72 days Let total work be 432 units {LCM of 48, 54, and 72} Efficiency of ‘Pawan’ = (432/48) = 9 units/day Efficiency of ‘Qureshi’ = (432/54) = 8 units/day Efficiency of ‘Ram’ = (432/72) = 6 units/day Amount of work done by ‘Pawan’ and ‘Qureshi’ together in 18 days = (9 + 8) × 18 = 306 units Remaining work = (432 – 306) = 126 units So, required time taken by ‘Ram’ = (126/6) = 21 days
Read the direction carefully and answer the following question.
Six students A, B, C, D, E and F are sitting in the field. A and B are from Neh...
- Seven boxes D, E, F, G, H, I and J are kept one above another. G is three boxes above I. There are two boxes between G and J. D is immediately above F. F i...
Which of the following shelf does the box with Tie kept?
Who among the following faces the one who teaches Physics?
How many floor between I and the one who likes SAMSUNG?
If T and the shopkeeper who have Honda interchange their auction days then how many shopkeeper auctioned after the one who have BMW cars?
__ lives to the south west of F
Four of the following five are alike in a certain way and hence they form a group. Which one of the following does not belong to that group?
...Which of the following movies does Vanya like?