Question
âPawanâ, âQureshiâ, and
âRamâ can finish 50%, 1/3, and 3/4 of a job in 24, 18, and 54 days, respectively. If âPawanâ and âQureshiâ start the job together and work on it for 18 days, calculate how long âRamâ will take to complete the remaining work alone.Solution
ATQ, Time taken by âPawanâ to complete the whole work = (24/0.50) = 48 days Time taken by âQureshiâ to complete the whole work = 18 Ă (3/1) = 54 days Time taken by âRamâ to complete the whole work = 54 Ă (4/3) = 72 days Let total work be 432 units {LCM of 48, 54, and 72} Efficiency of âPawanâ = (432/48) = 9 units/day Efficiency of âQureshiâ = (432/54) = 8 units/day Efficiency of âRamâ = (432/72) = 6 units/day Amount of work done by âPawanâ and âQureshiâ together in 18 days = (9 + 8) Ă 18 = 306 units Remaining work = (432 â 306) = 126 units So, required time taken by âRamâ = (126/6) = 21 days
A farming region where farmers focus solely on the cultivation and marketing of vegetables is referred to as:
Mulches generally minimize
Purple pigmentation in Brassicas is due to:
In greengram, nitrogen fixation starts at the age of
In which soil structure infiltration, permeability and aeration are good
In tile drainage, when the tiles arranged from one side only it is known as
âEconomics is the study of the administration of scarce resources and the determinants of employment and income.â Definition of Economics was given ...
âŚâŚâŚâŚâŚâŚâŚâŚis an example of Group Contact Method.
By which of the following processes water enter into seed coat first when a dry seed is placed in a suitable medium for germination?
Taxonomic significance of striations and lateral lines in nematodes is