Question
Vijay can do a piece of work in 16 days and Sanjay can
do the same work in 24 days. If Vijay works for 6 days and got Rs. 2700, and the remaining work will completed by Sanjay, then how much rupee Sanjay earned?Solution
Assume total work = LCM (16, 24) = 48 If the entire work is 48 units, Vijay can complete 3 unit per day, and Sanjay can complete 2 unit per days In 6 days, Vijay completes 18 units and got Rs.2700 i.e. Rs.150 per unit. Remaining work = (48 – 18)unit = 30 unit ∴ Sanjay earning = Rs.30 × 150 = Rs. 4500
Kissan Credit Card system was introduced byÂ
Which of the following are non-nutrient compounds found in plant derived food that have biological activity in the body.
Saffron revolution is related to
This system of irrigation supplies water to the plant equivalent to its consumptive use-
Fish which can float in the water column just above the seafloor.
Mitosis is the process by which a cell replicates its chromosomes and then segregates them, producing two identical nuclei in preparation for cell divi...
Which microbe is responsible for spoilage of canned foods?
Which nematode behavior is characterized by a spiral shape in the habitus?
S content in Copper sulphate is
Government of India announce MSP on the recommendation of