Question
Vijay can do a piece of work in 16 days and Sanjay can
do the same work in 24 days. If Vijay works for 6 days and got Rs. 2700, and the remaining work will completed by Sanjay, then how much rupee Sanjay earned?Solution
Assume total work = LCM (16, 24) = 48 If the entire work is 48 units, Vijay can complete 3 unit per day, and Sanjay can complete 2 unit per days In 6 days, Vijay completes 18 units and got Rs.2700 i.e. Rs.150 per unit. Remaining work = (48 – 18)unit = 30 unit ∴ Sanjay earning = Rs.30 × 150 = Rs. 4500
To select an entire row, the combination of keys to be pressed is:
What is the function of a Content Delivery Network (CDN) in web hosting?
What is the full form of SMPS?
Which of the following is considered as the volatile memory?Â
What is the smallest and largest font size available in Font Size tool on formatting toolbar?
ASCII is a coding system that provides
What is the mascot of Linux Operating System ?
Routing is done on which layer?
Within the Font Size tool on the formatting toolbar, what are the smallest and largest font sizes available?
What is LinkedIn?