Question
Vijay can do a piece of work in 16 days and Sanjay can
do the same work in 24 days. If Vijay works for 6 days and got Rs. 2700, and the remaining work will completed by Sanjay, then how much rupee Sanjay earned?Solution
Assume total work = LCM (16, 24) = 48 If the entire work is 48 units, Vijay can complete 3 unit per day, and Sanjay can complete 2 unit per days In 6 days, Vijay completes 18 units and got Rs.2700 i.e. Rs.150 per unit. Remaining work = (48 – 18)unit = 30 unit ∴ Sanjay earning = Rs.30 × 150 = Rs. 4500
Find the area of a figure consisting of a rectangle with length 8 cm and width 5 cm, and a semicircle with a diameter equal to the width of the rectangl...
What is the total revenue generated from all products in January?
Area of a rectangle is 96 m2 When the length of the same rectangle increased by 6 m and the breadth decreased by 3 m, then the area of the re...
- Which type of memory requires frequent refreshing to retain data?
Below given are 2 wrong number series, where ‘x’ is the correct replacement of the wrong term of series I & ‘y’ is the correct replacement of ...
If the sum of remainders, obtained on dividing 52436 by 22 and 59461 by 73, is divided by 13, then the remainder will be:
If (a + b) = 8 and ab = 10, then find the value of (a2Â + b2).
An unknown number is first multiplied by 111 and then 63 is added to it. When the resultant number is divided by 9, the quotient and remainder obtained ...
Find minimum of x + 9/x for x>0.
Let sinA+ sinB = a and cosA+ cosB = b, then the value of a² + b² = ?