What is the capacity of India's largest Battery Energy Storage System (BESS) commissioned by the Solar Energy Corporation of India Limited (SECI) in Rajnandgaon, Chhattisgarh?
The BESS has a capacity of 40 megawatts (MW) and 120 megawatt hours (MWh) and is combined with a solar photovoltaic (PV) plant with an installed capacity of 152.325 megawatt hour (MWh) and dispatchable capacity of 100 MW AC (155.02 MW peak DC).
Five friends, D, E, F, G and H, are sitting in a straight line. D and E are adjacent to each other. E is between D and F. D is third to the left of G. G...
Who among the following is an immediate neighbor of K?
What is the position of Z with respect to her sister?
Which of the following is R’s position?
Which of the following is true?
Who sits third to the right of T?
Who among the following likes Purple?
Who is sitting third to the left of C?
Five friends G, H, I, J and K are sitting in a straight line all facing in the north direction. G is sitting at one of the extreme ends. Three people ar...
Who among the following attends singing class on Wednesday?