Question
(x) men can do some work in 42 days. If 10 more men
added then the work would have been completed in 30 days, then in how many days (x+45) men can do the same work?Solution
let the Ratio of days is = 42 : 30 = 7 : 5 then Ratio of men will be = 5 : 7 2 units = 10 1 unit = 5 5 units = 5 x 5 = 25 Therefore, (x) = 25 (x + 45) = 70 men Therefore, Number of days taken by (x + 45) men will be = 25 x (42/70) = 15 daysÂ
A man can row a boat in still water at a speed of 8 km/h. He rows downstream for 1 hour and then returns upstream. If the total time taken for the entir...
- What is the term for restarting a computer that is already powered on?
{14.13 x 28.84 - 39.95% of 420.09 + 128.89} = ?
A coin is tossed. If head occurs, a ball is drawn from a bag containing 3 red and 4 green balls. If tail occurs, a die is thrown. The probability that t...
If a, b, c are in GP, then which of the following is always true ?
Solve the quadratic equations and determine the relation between x and y:Â
Equation 1: x² + 2x - 15 = 0
Equation 2: y² - 4y - 12 = 0
A man observes the top of a tower at an angle of elevation of 45°. He walks 50 meters towards the tower, and the angle of elevation becomes 60°. What ...
Simplify: (1 + i)³ / (1 + i³)
Let sinA+ sinB = a and cosA+ cosB = b, then the value of a² + b² = ?
A particular sum of money, when invested at a simple interest rate, yields Rs. 3,000 as interest after 2 years. The same sum, whe...