Start learning 50% faster. Sign in now
Let the efficiency of ‘N’ = ‘5x’ units/day Efficiency of ‘M’ = ‘8x’ units/day Time taken by ‘M’ to complete the remaining work = 24 – 20 = 4 days Total work = 20 × 5x + 4 × 8x = 132x units Desired time = 132x/8x = 16.5 days
Choose the correct image of the given question from the given options.
Select the correct mirror image of the given combination when the mirror is placed at ‘MN’ as shown.
Select the correct mirror image of the given combination when the mirror is placed at line MN as shown.
Select the correct mirror image of the given figure when the mirror is placed at MN as shown below.
Select the correct mirror image of the given combination when the mirror is placed at ‘MN’ as shown.
Select the correct mirror image of the given figure when the mirror is placed to the right side of the given figure.
Select the correct mirror image of the given figure when the mirror is placed to the right side of the figure.
Select the correct mirror image of the given combination when the mirror is placed to the right side of it along MN.
If a mirror is placed on the line XY, then which of the answer figures is the mirror image of the given figure?
From the figures provided below. Find the correct figure in which the question figure is embedded/hidden?