John can do 1/2 work in 3 hours, So he can complete entire work in 6 hours. Remaining work = 1- 1/2 = ½ Joe does 1/4 of the remaining work i.e 1/8 work in 1 hour, So he can complete entire work in 8 hours. Now remaining work = 3/8 George finishes remaining work in 5 hour. George do 3/8 work in 5 hours, So he can complete entire work in 40/3 hours. If all three work together, then, 1/6 + 1/8 + 3/40 = 30/11 So, the answer would be option d) 2(8/11) hours
Which are true examples of formal garden?
Which among the following is generally known as twin deficit?
Which soil structure type is characterized by the arrangement of particles into thin, flat plates that lie horizontally?
Which nematode is known as cyst nematode?
The vitamin which helps in the conversion of Tryptophan to Niacin is:
Tree banding is done in mango trees to control ______ insect pest.
Which type of lifecycle is observed in thrips?
Average gestation period of cow is:
Bengal famine (1943) was caused due to ____ disease which attacked ____ crop.
Which is the trade name of flufenoxuron insecticide?