Question
John does ½ piece of work in 3 hours, Joe does
¼ of the remaining work in 1 hour and George finishes remaining work in 5 hours. How long would it have taken the three working together to do the work?Solution
John can do 1/2 work in 3 hours, So he can complete entire work in 6 hours. Remaining work = 1- 1/2 = ½ Joe does 1/4 of the remaining work i.e 1/8 work in 1 hour, So he can complete entire work in 8 hours. Now remaining work = 3/8 George finishes remaining work in 5 hour. George do 3/8 work in 5 hours, So he can complete entire work in 40/3 hours. If all three work together, then, 1/6 + 1/8 + 3/40 = 30/11 So, the answer would be option d) 2(8/11) hours
One of the most important oilseed crop Arachus hypogea contains ___% oil.Β
Which one is not related with 4-H club?
Damping off and leaf blights are very effectively checked by
Durum/ Macroni wheat (Triticum durum) is:
The concentration of CO2 in the soil atmosphere is β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦..
...The four principles of organic farming do not include
Diamond Back Moth (DBM) is a specific insect of which crop?
Which agro climatic region has highest intensity of agriculture in the country?
The movement and filtration of water through soils and permeable rock is termed as
In symbiotic relationship between plant and bacteria