Question
A does 2/5 of a work in 9 days. Then B joined him and
they together completed the remaining work in 6 days. B alone can finish the whole work inSolution
If A can complete 2/5 of work in 9 days, then he can complete whole work in (9×5)/2 = (9×5)/2 = 22.5 days. Let B take x number of days to complete the work. According to question, (2/45 + 1/x) × 6 = 3/5 x = 18 days. So, the answer would be option d) 18 days
This training system involves training fruit trees to grow in a flat, formal pattern against a support structure like a wall or trellis. This space-effi...
Out of the following drugs, which is most common anthelmintic drug used in animals?
In C4 plants, the first stable product of photosynthesis is:
The temperature requirement of rice at blooming stage is:
Soil permeability is a broad term used to define the ability of the soil for:
How much quantity of true potato seed is required for one hectare planting?
National Research Centre for Litchi (NRCL) is located at _________
The term "handled the ball" is used in which game?
A plant that has seeds but no flowers and fruits?
Which plant hormone is unique because it exists in a gaseous form and regulates fruit ripening and senescence?