Question
A does 2/5 of a work in 9 days. Then B joined him and
they together completed the remaining work in 6 days. B alone can finish the whole work inSolution
If A can complete 2/5 of work in 9 days, then he can complete whole work in (9×5)/2 = (9×5)/2 = 22.5 days. Let B take x number of days to complete the work. According to question, (2/45 + 1/x) × 6 = 3/5 x = 18 days. So, the answer would be option d) 18 days
Which of the following potential is always negative?
In CRD design the degree of freedom for error is calculated by which formula?
Marconi wheat is known as:
Which crop is called 'camel crop"?
The synthesis of ATP via electron flow through the ETS, with oxygen as the terminal electron acceptor, is known...
According to latest Final estimates of Foodgrain production 2023-24, Which state is the largest producer of sugarcane in India?
Tikka disease of groundnut spreads fast under the conditions of:
Pradhan Mantri Krishi Sinchai Yojana (PMKSY) was launched in the year___
What is the meaning of the word "Chrysanthemum," as derived from its etymology?
Of which South-East-Asian country did Joko Widodo become the President in 2019 for the second time?