Question
7 men and 4 boys can complete a work in 6 days. A man
completes double the work than a boy. In how many days will 5 men and 4 boys complete the work?Solution
7 M + 4 B = 6 days and 1 man = 2 boys 7 M + 2 M = 6 days ⇒ 9M = 6 days 1 M = 6 x 9 = 54 days Now, 5 M + 2M = 7M 1 M = 54 days 7M = 54/7 = `7(5/7)` days
Which of the following is popularly known as queen of nut crops?
ICAR- National Bureau of Animal Genetic Resources is situated at ___Â
The elements that are required in larger amount i.e. more than 1 ppm, are referred to as
On brinjal crop, malathion 50 EC is sprayed in the concentration of:
In glycolysis process ___ NADH2 and __ ATP are formed.
Phosphorus availability to plants is the maximum in the pH range of:
ICAR- Indian Institute of Soil and Water conservation is located at __
Full form of IFFCO is________
 Which new wheat variety stands out for its ability to release glucose more slowly into the bloodstream?Â
In paddy, the clipping of tip of seedlings is done as a preventive measure against which pest?Â