Question
Lata can do 1/3rd of a work in 4 days and
Asha can do 1/6th of the same work in 3 days. If both work together then how many days will it take to complete 75% of the work?Solution
Lata does the 1/3rd part of a work in = 4 days In 1 day, Lata will do = 12 Work            Archna does the 1/6th part of a work in = 3 days In 1 day, Archana will do = 18 Work If both work together, efficiency will be 2+3 = 5
Chemical formula of single superphosphate is:
FIRB method of planting is followed in which crop?
The substance that is added to make natural rubber strong and more bouncy is-
Soil incorporation of herbicide decomposed by sunlight should be done
A loan which is given for time period of 15 months and could be utilized for purchasing of seeds and fertilizers is known as__________
Cultivation of crops in areas receiving annual rainfall more than750 mm but less than 1150 mm is known as
Which irrigation method is suitable for cotton grown in heavy soils like clay and loam, reducing water usage by 50%?
The product of pedigree selection is
For green manuring sunhemp can be sown duringÂ
Extending over Rajasthan, West of the Aravalis, this region has an erratic rainfall of an annual average of less than 25 cm. Bajra, jowar, and mot...