Question
A takes 24 hours more than B to complete the work, and
32 hours more than C to complete the same work. The combined time taken by A and B to finish the work is equal to the time taken by C alone. Find the time required by B alone to complete the work.Solution
ATQ,
Let the time taken by C alone to complete the work be ‘x’ days. So, time taken by A alone to complete the work = (x + 32) days. Time taken by B alone to complete the work = (x + 32 – 24)= (x + 8) days According to question, {(x + 32) (x + 8)}/ {(x + 32) + (x + 8)} = x x ² + 40x + 256 = x(2x + 40) x ² = 256 x = 16 So, time taken by B alone to complete the work = 16 + 8 = 24 daysÂ
The perimeters of 2 similar triangles ∆ABC and ∆PQR are 18 cm and 12 cm respectively. If PQ= 8 cm, then AB is?
∆ABC and ∆DEF are similar and their areas are respectively 16 cm2 and 64 cm 2 . If EF = 6 cm BC is?
In the given figure CD is parallel to AB then ∠y is?

The lengths of three medians in a triangles are 24 cm, 32 cm, 40 cm. What is the area of that traingle (in cm 2 )?
- Length of a chord in a circle of radius 'r' cm, is 14 cm and distance between chord and centre of the circle is 24 cm. Find the value of (4r - 60).
The radius of a circle is 13 cm, and the length of the chord is 10 cm. Find the distance between the chord and the centre of the circle. Â
The area of an equilateral triangle is 4√3 sq m. Its perimeter isÂ
If median AD of an equilateral ∆ABC is 6 cm and G is centroid. Find AG?
What will be inradius of an equilateral triangle of side 4 cm?
The length of the each side of an equilateral triangle is 42√3. The area of incircle, (cm 2 ) is