Question
'A' and 'B' alone can complete a work in 9 days and 18
days, respectively. Find the time taken by them to complete the work if they work on alternate days starting with 'A'.Solution
ATQ, Let the total work be the LCM of 9 and 18, which is 18 units. Efficiency of 'A' = 18/9=2 units/day Efficiency of 'B' = 18/18=1 unit/day If the work was started by 'A', then on the first day, work completed by 'A' = 2 units On the next day, work completed by 'B' = 1 unit Therefore, in two days, the amount of work completed by 'A' and 'B' = 2 + 1 = 3 units So, in 12 days, work completed by 'A' and 'B' = 3 × 6 = 18 units Therefore, total time taken by them to complete the work = 12 days
A mass of 0.1 kg executes SHM with amplitude 10 cm. Its kinetic energy at the mean position is 8 × 10-3 J. What is its equation of motion if...
The stress–strain graph for two wires A and B is shown. Wire A has a steeper linear region than B. This indicates that:
What does 'IC' stand for in electronics?
Water flows through a horizontal pipe at a constant volumetric rate. At a location where the cross sectional area decreases, the velocity of the fluid:
The material which can be deformed permanently by heat and pressure is called a:
A spherical ball made of steel when dropped in mercury container will –
Which instrument is used to measure electric current?
The pitch of a sound is primarily determined by which of the following?
Which of the following is NOT a conductor of electricity?
A force of 50 N moves a body 2 meters in the direction of the force. Find work done.