Question
A can finish a piece of work in 12 days and B can finish
it in 18 days. They work together for 4 days, after which B leaves. In how many more days will A complete the remaining work?Solution
Take total work = LCM of 12 and 18 = 36 units A’s 1-day work = 36 / 12 = 3 units B’s 1-day work = 36 / 18 = 2 units Together 1-day work = 3 + 2 = 5 units Work done in 4 days = 4 × 5 = 20 units Remaining work = 36 − 20 = 16 units A alone does 3 units/day. Required days = 16/3 = 5 1/3 days
A sum of money is divided among P, Q, R and S in the ratio of 3:4:8:9 respectively. If the share of R's is Rs. 2600 more than the share of Q, then what ...
Divide ₹720 among A, B and C in the ratio 5 : 7 : 12.
Three numbers ‘P’, ‘Q’ and ‘R’ are such that ‘P’ is 25% more than ‘Q’ and ‘R’ is equal to the average of ‘P’ and ‘Q’. I...
If a/b =c/d =e/f =2/3 Then (2a2-3c2+4e2)/ (2b2-3d2+4f2) =?
The ratio of the salaries of Amit, Raj, and Dev is 5:6:7 respectively. Sumit’s salary is 10 rupees less than Amit’s. If the difference between Dev ...
Divide ₹8400 among A, B, C such that A:B = 2:3 and B:C = 4:5.
Two numbers are in the ratio of 6:13. If three is added to both numbers, the ratio becomes 1:2. Find the smaller number.
Divide Rs. 840 among A, B and C in the ratio 2 : 3 : 5.
A sum of Rs. 642 is divided among X, Y and Z such that X gets Rs. 144 more than Y. Y gets Rs. 90 more than Z. Find the share of Z?Â
The ratio between two numbers is 1:2. If each number is increased by 8, the ratio between then become 5:6, find the difference between numbers.