Question
A and B can complete a piece of work in 12 days and 16
days respectively. They work together for 4 days, and then A leaves. How many more days will B take to finish the remaining work?Solution
Work done by A and B together in 1 day = 1/12 + 1/16 = (4 + 3)/48 = 7/48. Work done in 4 days = 4 × (7/48) = 28/48 = 7/12. Remaining work = 1 - 7/12 = 5/12. B completes 1/16 work per day. Time taken by B = (5/12) ÷ (1/16) = (5/12) × 16 = 80/12 = 6.67 days. Correct Option: b
If base of a prism is square of side 8 cm & height is 20 cm . What is the volume of prism?
If 2156 is added in a number then number become 344(4/9)% of itself. Find the original number?
The volume of a cube is 216 cm³. If the cost of painting the cube is Rs. 12 per cm², then find the cost of painting five faces of the cube.
A rectangular water tank is 80 m x × 40 m. Water flows into it through a pipe of 40 sq.cm at the opening at a speed of 10 km/hr. The water level will ...
A cuboid has length 10 cm, breadth 8 cm and height 6 cm. What is its volume?
The diameter of the base of a cylindrical drum is 70 cm and its height is 15 cm. The drum is full of water and the water from the drum is transferred to...
A cube of 25 cm side is divided into 125 smaller cubes of equal volume. Find the side of smaller cubes:
The cost of fencing a rectangular field at the rate of Rs. 4/metre is Rs. 360. If the length of the field is 13 metres more than its breadth, then find ...
The area of a rhombus is 168 cm2. The length of one of its diagonals is 28 cm. The length of the other diagonal is:
Curved surface area of cylinder is 646.8 cm2. If ratio of radius to height of the cylinder is 10:4 respectively, then find the base area of t...