Question
A and B can complete a piece of work in 12 days and 16
days respectively. They work together for 4 days, and then A leaves. How many more days will B take to finish the remaining work?Solution
Work done by A and B together in 1 day = 1/12 + 1/16 = (4 + 3)/48 = 7/48. Work done in 4 days = 4 × (7/48) = 28/48 = 7/12. Remaining work = 1 - 7/12 = 5/12. B completes 1/16 work per day. Time taken by B = (5/12) ÷ (1/16) = (5/12) × 16 = 80/12 = 6.67 days. Correct Option: b
Which of the following is the first hybrid of sunflower released in India?
In the soil water-plant continuum, what is the driving force that allows water to move from the soil through the plant to the atmosphere?
Which one is insect trap crop?
The seed rate for true potato seed should be:
The inflorescence of fennel is which of the following?
Which method is commonly used to break physical dormancy?
…………….. refers to removal of field heat (quick cooling) after harvest; if not, its deterioration is faster at higher temperature of 1 hour at ...
Which of the following is an external, material and non-transferable good?
To break the dormancy of seed, a process of scratching, or mechanically altering the seed coat to make it permeable to water and gases is done. It is kn...
Who has become the first women Director General of World Trade Organization?