Question
A and B can complete a piece of work in 12 days and 16
days respectively. They work together for 4 days, and then A leaves. How many more days will B take to finish the remaining work?Solution
Work done by A and B together in 1 day = 1/12 + 1/16 = (4 + 3)/48 = 7/48. Work done in 4 days = 4 × (7/48) = 28/48 = 7/12. Remaining work = 1 - 7/12 = 5/12. B completes 1/16 work per day. Time taken by B = (5/12) ÷ (1/16) = (5/12) × 16 = 80/12 = 6.67 days. Correct Option: b
Grodex test is used in the determination of
Element required for seed formation is
National seed act was passed in
What is the minimum genetic purity required for certified hybrid cotton seeds?
Which part of sugarcane is preferred for sowing?
Double seed formation is the symptom of which pest and in which crop?
ICAR- Central Institute of Cotton Research is located at ___
What is the minimum isolation distance for certified sorghum hybrid seed production?
Which of the following is not matched correctly?
What is the validity period of the seed certificate after tagging?