Question
A is capable of finishing a task in 60 days. B requires
40% more time than A to finish the same task. How many days will A and B need to complete 80% of the work together?Solution
Time taken by B to complete the whole work = 1.40 × 60 = 84 days Let total work = 420 units (LCM of 60 and 84) Efficiency of A = 420/60 = 7 units per day Efficiency of B = 420/84 = 5 units per day Desired time = (0.80 × 420)/12 = 28 days
- Determine which solid has a greater volume.
I) A cuboid having dimensions 7 cm, 10 cm, and 6 cm
II) A cube with each edge measuring 9 cm If the height of a cylinder is doubled and radius is reduced by 75%, then what is the percentage change in its volume?
The diagonals of a rhombus are 16 cm and 12 cm. What is the perimeter of the rhombus?
What is the difference between (in m2) the area of a circular field of radius 21 metres and area of a rectangular piece of land having its di...
What is the length (in cm) of chord PQ in a circle with a radius of 7 cm, where a diameter AB and non- diameter chord PQ intersect perpendicularly at po...
A village having a population of 5000 requires 250 litres of water per head per day. It has a tank measuring 50 m × 40 m × 25 m. The water o...
A solid cube, whose edge is of length 60 cm, is melted. Identical solid cubes, each of volume 216 cm3, are made of this molten cube, without ...
A right circular cylinder having total surface area of 16940 cm2 is immersed in a vessel completely filled with water. If the height of the c...
A circular wire of diameter 70 cm is folded in the shape of a rectangle whose sides are in the ratio 3:2. Find the area enclosed by the rectangle.
A rectangular tank has a length of 12 m, width of 10 m, and height of 8 m. It is filled with water up to 60% of its capacity. A cylindrical pipe with ra...