Question
A work can be completed by βAβ and βBβ, alone in
15 days and 20 days, respectively. Find the number of days taken by βCβ to complete the same work alone if βAβ, βBβ and βCβ together can complete the whole work in 4 days.Solution
Let total work = 60 units (LCM of 15 and 20) Efficiency of βAβ = (60/15) = 4 units/day Efficiency of βBβ = (60/20) = 3 units/day Combined efficiency of βAβ, βBβ and βCβ = (60/4) = 15 units/day Efficiency of βCβ = 15 β (4 + 3) = 8 units/day Required time taken = (60/8) = 7.5 days
The branch of biology developed to study chromosomes and its application in genetics is known as:
When both the alleles of gene are fully expressed in a heterozygote, what is this phenomenon called?
On brinjal crop, malathion 50 EC is sprayed in the concentration of:
Damping off and leaf blights are very effectively checked by
Chhena of better quality is prepared from
Udbatta disease in rice is caused by
Example of CAM plants is ?
The term βArrowingβ is associated with
Which of the following given options does not have a cell wall?
The concentration of CO2 in the soil atmosphere is β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦..
...