Question
P’s 5 days work is equal to Q’s 7 days work. If P
and Q together can complete the work in 20 days then how much time Q will take to complete 75% of the work?Solution
Ratio of efficiency of P and Q = 7:5 Let the efficiency of P and Q be 7x and 5x units per day respectively. Total work = 12x × 20 = 240x units Required time = (0.75 × 240x)/5x = 36 days
What will be the output of the code
int main(){
int x= 10;
int y=10;
int s=-(-x-y)
cout<
return 0;
}
In a virtual memory system, what is a "page fault"?
Which type of transistor is less susceptible to thermal runaway?
What is the unit of electric current?
Which transport layer protocol provides connection-oriented, reliable, and ordered delivery of data packets between applications?
The result of SQL select statement is?
What is an ER diagram used for?
Which routing protocol is commonly used within an autonomous system (AS) to determine the best path for data packets?
Which distribution is used to model the number of successful outcomes in a fixed number of independent Bernoulli trials?
Which component in the MVC architecture communicates directly with the database?