Question
P’s 5 days work is equal to Q’s 7 days work. If P
and Q together can complete the work in 20 days then how much time Q will take to complete 75% of the work?Solution
Ratio of efficiency of P and Q = 7:5 Let the efficiency of P and Q be 7x and 5x units per day respectively. Total work = 12x × 20 = 240x units Required time = (0.75 × 240x)/5x = 36 days
Which type of hydrogen is produced from fossil fuels without capturing the resultant carbon emissions?
The chemical name of the Vitamin B6 isÂ
Match the following Functional group with their respective Chemical name.
            Functional Group             �...
What type of substance is commonly used as a thermometric material due to its responsiveness to temperature changes?
Which of the following is NOT a base?
Cinnabar is an ore of which metal?
Which alkali metal is represented by the atomic number 3?
The chemical name of 'Common salt’
What is the chemical name of Baking Soda ?Â
Whitening of hair is caused by the deficiency of _________?