Question
Virat can do a piece of work in 26 days and Sachin can
do the same work in 39 days. If Virat works for 5 days and got Rs. 3000, and the remaining work will completed by Sachin, then how much rupee Sachin earned?Solution
Assume total work = LCM (26, 39) = 78 If the entire work is 78 units, Virat can complete 3 unit per day, and Sachin can complete 2 unit per days In 5 days, Virat completes 15 units and got Rs.3000 i.e. Rs.200 per unit. Remaining work = (78 – 15)unit = 63 unit ∴ Sachin earning = Rs.63 × 200 = Rs. 12600
The NISAR satellite, set to be launched in March 2025, is a collaborative project between which two countries?ย
Hydrogen was discovered by:
Which extinct species was revived using ancient DNA sequencing and gene editing by Colossal Biosciences?
Sir CV Raman was awarded Nobel Prize for his work connected with which of the following phenomenon of radiation?ย
What is the range capability of Indiaโs first long-range hypersonic missile?
Which of the following contributes to acid rain?
Which gas is responsible for the depletion of the ozone layer?