Question
A can complete a piece of work in 16 days and B can
complete it in 24 days. They work together for 4 days and then B leaves. In how many total days is the work completed?Solution
Take total work = LCM(16, 24) = 48 units. Aβs rate = 48/16 = 3 units/day Bβs rate = 48/24 = 2 units/day Together (first 4 days): Daily work = 3 + 2 = 5 units Work done in 4 days = 5 Γ 4 = 20 units Remaining work = 48 β 20 = 28 units Now only A works: Time taken by A for remaining work = 28 / 3 days = 9β days Total time = 4 + 9β = 13β days
In a sphere if the radius is increased by 25% then by how much percentage volume increased:
The volume of a cube is 64 cm3. If the cost of painting is Rs. 20/cm2 , then find the cost of painting the four faces of the cube.
The radius of a cylindrical metal drum is 18 cm. The height is 25% less than its radius. If 1 cmΒ³ of the metal weighs 0.3 gm, find the total weight of ...
The perimeter of an equilateral triangle is 36β3 cm. Find its height.
On a rectangular wall of length 35 metres and height 30 metres, there is a window in the shape of triangle surmounted on a square. If the base of triang...
The ratio of length to breadth of a rectangle is 5:4, respectively. Perimeter of rectangle is 252 cm. If each side of a square is 25% more than the brea...
The cost of fencing a rectangular field at the rate of Rs. 14/metre is Rs. 1176. If the ratio of length to breadth is 4:3, find the area of the rectangu...
If ratio of interior & exterior angle of a regular polygon is 4:5, then number of sides of the polygon is
The lengths of a pair of parallel sides of a trapezium are respectively 12 cm and 20 cm, and the perpendicular distance between these two sides is 14 c...
The perimeter of a rectangular field is 20 metres and its area is 18 m2 . What is the length of the diagonal of this field?