Question
A and B together can finish a work in 10 days. If A
alone can finish it in 25 days, in how many days can B alone finish it?Solution
Let total work = 1 unit. (A + B)’s 1-day work = 1/10 A’s 1-day work = 1/25 So B’s 1-day work = 1/10 − 1/25 LCM(10,25) = 50 1/10 = 5/50 1/25 = 2/50 B’s 1-day work = (5 − 2)/50 = 3/50 Time for B alone = 1 ÷ (3/50) = 50/3 days
Small reddish brown spot surrounded by water soaked margin with yellow holes appear on soybean pods are the symptoms of:
The average dry matter requirement of desi cow is ____ during dry period and ____ during lactating period.Â
‘Heart rot’ in Sugarbeet and ‘water core’ in turnip are the deficiency symptoms of:
Biggest Fertilizer Cooperative in India is?
The largest family in order Coleoptera is ____
Globally India has been ranked ____ in terms of Oilseeds production
Transfer cells are highly specialized plant cells which are involved inÂ
The light intensity at which photosynthesis and respiration are equal is called:
What is the subsidy for 15 hp mb plough for SC/ST women according to NABARD
The relationship between two organisms, where both of them benefit from each other is called ____