Question
P and Q together can complete 75% of a work in 15 days
while Q alone takes 40% more time than P and Q together to complete the whole work. Find the time taken by P alone to complete 90% of the work.Solution
ATQ, Time taken by P and Q together to complete the whole work = 15/0.75 = 20 days Time taken by Q alone to complete the whole work = 1.40 × 20 = 28 days Total work = 140 units (LCM of 20 and 28) Amount of work done by P and Q together in one day = 140/20 = 7 units Amount of work done by Q alone in one day = 140/28 = 5 units Amount of work done by P alone in one day = 7 – 5 = 2 units Desired time = (0.90 × 140)/2 = 63 days
Eight friends are sitting around a square table, four at the corners and four in the middle of the four sides, facing the centre. Isheen is an immediate...
Statements:
Some dates are hazelnuts.
All hazelnuts are walnuts.
Conclusions:
I. Some dates are walnuts.
II. Some...
Select the word-pair that best represents a similar relationship to the one expressed in the pairs of words given below.
(The words must be consi...
A is the good of B, which is the only son of C. D is the husband of C. What does A have to do with C?
Choose the one which is different from other three alternatives
Six words Eat, Cry, Play, Sleep, Run and Bath are written on different faces of a dice. Three positions of this dice are shown in the figure. Find the w...
Suppose the first and the second letters of the word ADMINISTRATIVELY changed places, also the third and the fourth, the fifth and the sixth, and so on ...
Read the given statements and conclusions carefully and decide which of the conclusions logically follows from the statements.
Statements:
...Two persons A and B lent certain amount at the same rate of interest for two and three years respectively under compound interest. If their final amount...
Select the option in which the figure given below is embedded. (Rotation of the shape is not allowed)