Question
P and Q together can complete 75% of a work in 15 days
while Q alone takes 40% more time than P and Q together to complete the whole work. Find the time taken by P alone to complete 90% of the work.Solution
ATQ, Time taken by P and Q together to complete the whole work = 15/0.75 = 20 days Time taken by Q alone to complete the whole work = 1.40 × 20 = 28 days Total work = 140 units (LCM of 20 and 28) Amount of work done by P and Q together in one day = 140/20 = 7 units Amount of work done by Q alone in one day = 140/28 = 5 units Amount of work done by P alone in one day = 7 – 5 = 2 units Desired time = (0.90 × 140)/2 = 63 days
The cost price of 21 mangoes is Rs.200. Because of bad quality of mangoes, the shopkeeper has to sell mangoes at a loss that is equal to selling price o...
A man observes the top of a tower at an angle of elevation of 45°. He walks 50 meters towards the tower, and the angle of elevation becomes 60°. What ...
In a triangle ABC, the sides are AB = 15 cm, BC = 20 cm, and AC = 25 cm. Find the area of the triangle using Heron’s formula.
Determine the single equivalent discount of two successive discounts of 12% each?
From the top of a building, the angle of depression to a point on the ground is 45 degrees. If the building is 50 meters high, how far is the point from...
The average age of a group of 5 men is 30 years. If one man aged 35 leaves and a new person joins the group, raising the average age by 1 year, find the...
The following table shows the marks obtained by five students in three subjects:
What is the total number of cars sold by Dealership S in the given five months?
A train travelling at a speed of 80 km/h, takes 27 seconds to cross a pole. If the train increased its speed by 10 km/h, how long would it take to cross...
A person 'P' invested Rs. 5,600 at a simple interest rate of 25% per annum for a specific duration, resulting in a total amount o...