Question
P, Q and R together can complete a task in 12 days. Q and R
together can finish it in (72/5) days, and R alone can do half the task in 8 days. What is the efficiency ratio of P to Q?Solution
ATQ,
1/P + 1/Q + 1/R = 1/12
R alone completes the whole task = 8 * 2 = 16 days
1/P = 1/12 – 5/72 = (6 – 5)/72 = 1/72
1/Q = 5/72 – 1/16 = (10 – 9)/144 = 1/144
P alone completes the task = 72 days
Q alone completes the task = 144 days
Required ratio = (1/72) : (1/144) = 2 : 1
The yellow vein mosaic of okra is majorly transmitted by ____
In which relation, an increase or a decrease in production of one product affect the production of the other inversely
When did cotton become a well-established crop in the Indus River Valley?
When to irrigate wheat after sowing if only one irrigation water is available:
The Law of Segregation states that:Â
Idea of hybrid maize was first conceived by E.M East and G.H Shull in 1910 by which technique among the inbred lines?
Which of the following is not the characteristic feature of class Insecta?Â
Fanging is related to
The size of the clay particles is:
Which plant exhibits modified papery calyx enclosing the fruit loosely with entrapped air for seed dispersal ?