Question
P, Q and R together can complete a task in 12 days. Q and R
together can finish it in (72/5) days, and R alone can do half the task in 8 days. What is the efficiency ratio of P to Q?Solution
ATQ,
1/P + 1/Q + 1/R = 1/12
R alone completes the whole task = 8 * 2 = 16 days
1/P = 1/12 – 5/72 = (6 – 5)/72 = 1/72
1/Q = 5/72 – 1/16 = (10 – 9)/144 = 1/144
P alone completes the task = 72 days
Q alone completes the task = 144 days
Required ratio = (1/72) : (1/144) = 2 : 1
Select the option that is related to third letter cluster in the same way second letter cluster is related to first letter cluster.
DECIMAL: Z...
Select the option that is related to third number-cluster in the same way first number cluster is related to second number-cluster.
86 : 28 :: 75 : ?
In the following question, four letter pairs are given. The letters on left side of (–) is related to the letters on the right side of (–) with some...
Select the option that is related to the third number in the same way as the second number is related to the first number.
72 : 101 :: 98 : ?
Select the option in which the pair of letter clusters is related in the same way as the pair of letter clusters given below.
GPU: KTYÂ
Select the number combination of letters that when placed sequentially in the blanks of the given series will complete the series.
A B A C _ D A ...
If S = 38, SHE = 64, then ‘SEND’ will be equal to?
If VAN = 22114 and VICE = 22935, then VERSE =
- Select the option that is related to the third letter-cluster in the same way as the second letter-cluster is related to the first letter-cluster.
G... Select the option that is related to the third term in the same way as the second term is related to the first term.
PAMPER: OCRQDO:: HEALTH:?