Question
Billy, Tony and Mike were three workers, employed by a
Contractor. They completed the whole work in 20 days. Initially all of them worked together, but the last 60% of the work was completed by only Tony and Mike together. Billy worked with Tony and Mike only for initial four days then he left the work due to his poor health. Also, Tony takes 25% less time to finish the work alone than that of Mike working alone. If they were paid Rs. 150000 for the entire work, then what is the share of least efficient person?Solution
Initial 4 days [Billy + Tony + Mike (40%)] + Last 16 days [Tony + Mike (60%)] = Total 20 days From the above statement, it is clear that efficiency of Tony and Mike is 60/16 = 3.75% Efficiency of Billy, Tony and Mike is 40/4 = 10%. It means efficiency of Billy alone is (10-3.75) = 6.25% Now, Tony : Mike Number of days 3 : 4 Efficiency 4 : 3 ∴ Efficiency of Tony = 4/7 ×3.75 = 2.14% Efficiency of Mike = 3/7 ×3.75 = 1.61% Thus the least efficient person is Mike Share of work done by Mike= 1.61 × 10 = 16.1% ∴ Mike’s Share of Amount = 16.1% of 150000 = 24150
Twinkling of the Stars is due to the phenomenon ofÂ
What is the SI unit of power?
One Kilowatt hour is equal to—
In a coil with n turns, what happens to the induced electromotive force (EMF) if the number of turns is doubled while the magnetic flux remains constant?
Pulsars are :
What is the colour of neutral wire?
1) Red
2) Green
3) Black
4) Yellow
The Mud festival ‘Chikhal Kalo’ is celebrated in which state?
S.I unit of Inductance is
What is the SI unit for measuring speed?
The Atom Bomb dropped in Nagasaki is an uncontrolled nuclear fission made up of: