‘Pooja’ alone can finish a piece of work in 60 days.
After working for 36 days, she left the job. ‘Vikram’ then completed the rest in 12 days. How many days will Vikram take to complete 80% of the workSolution
ATQ,
Pooja’s work = 36/60 = 3/5
Remaining = 1 - 3/5 = 2/5
Vikram does 2/5 in 12 days
Full time for Vikram = 12 × (5/2) = 30 days
80% work = 0.8 × 30 = 24 days
Which seed class is associated with a golden yellow tag in India?
Nuclei contain densely granular region called
Triazines and triazinones inhibit ______
The major difference between prokaryotes and eukaryotes includes
Gene for Gene hypothesis was given by
Soils with low PH are more acidic, Acid soils are best reclaimed by using:
_______________ is the gamma-ray induced mutant of the multibracted bougainvillea cultivar.
The process of collecting and analyzing information from field and secondary sources in a short period of time is:
Which of the following is a biennial crop?
Which system provides the accurate positional information, which will be more useful in locating the spatial variability with accuracy?