Question
A, B and C can complete a work in 15, 20 and 30 days
respectively. They all start working together. After 3 days, C leaves. The remaining work is completed by A and B together. In how many total days is the work finished?Solution
A’s 1-day work = 1/15 B’s 1-day work = 1/20 C’s 1-day work = 1/30 Work done in first 3 days by A+B+C: Daily work = 1/15 + 1/20 + 1/30 LCM(15,20,30)=60 1/15=4/60, 1/20=3/60, 1/30=2/60 Total per day = 9/60 = 3/20 In 3 days: 3 × 3/20 = 9/20 Remaining work = 1 − 9/20 = 11/20 Now only A and B work: A+B per day = 1/15 + 1/20 = (4+3)/60 = 7/60 Time to finish remaining work: (11/20) ÷ (7/60) = (11/20) × (60/7) = (11×3)/7 = 33/7 days Total time = 3 + 33/7 = (21+33)/7 = 54/7 daysÂ
If sin α + cos β = 2 (0˚ ≤ β < α ≤ 90˚), then sin[(2α + β)/3] =?
Two buildings are 40 meters apart. The height of one building is 20 meters. From the top of the shorter building, the angle of elevation of the top of t...
If cos² x + sin x = 5/4, then find the value of 'sin x'.
- If sec A = 2, then what will be the value of sin² A?
Find the maximum value of (20sin A + 15cos A).
If tanθ – cotθ = a and cosθ + sinθ = b, then (b2 –1)(a2 + 4) = ?
If x = 4 cos A + 5 sin A snd y = 4 sin A – 5 cos A, then the value of x2+y2 is :
Find the value of the given trigonometric expression:
(sin 25°cos 65° + cos²25°) × sin 30° + (cos 60°tan 45°) × sec 60°
...- From the top of a tower, the angle of depression to the top of a man's head is 60°. The man is 4 feet tall and is standing 20 feet away from the base of t...
If cot A = 12/5, then the value of (sin A + cos A) × sec A is ________.