Question
βAβ can do a piece of work in 12 days. βBβ can
do 70% of the same work in 30 days. If they work together for the entire time and get paid Rs.1504, then find the share of βAβ.Solution
Let the total work be 60 units. (LCM of 12 and 30) Efficiency of A = 60/12 = 5 units/day Efficiency of B = (60/30) Γ (70/100) = 7/5 units/day Ratio of the efficiency of A : B = 5 : 7/5 = 25:7 Share of A = (25/32) Γ 1504 = Rs.1175
A _______ is a promotion strategy that calls for using the sales force and trade promotion to move the product through channels.
Gypsum is recommended in cultivation of:Β
Stevenson screen is used along with an instrument for obtaining an accurate result. Which instrument?
Chemically most of the sand grains are
What is the chemical name of insecticide having trade name of βPrideβ?
Among the following insect groups, which one completely lacks chewing mouthparts, being specialized for fluid feeding?
Soils with low PH are more acidic, Acid soils are best reclaimed by using:
Agronomic method of controlling soil erosion are employed if the slope isβ¦β¦β¦β¦β¦β¦β¦
In which type of planting are seedlings planted close to each other i.e. the spacing is kept lower than the normal spacing?Β
Which of the following statements is/are true?
Statement A: Mica and biotite are the secondary minerals but also act as primary minerals.
...