Question
'Akshay' alone can do a piece of work in 25 days. 'Ben'
alone takes 40 days to do the same work. How much 'Akshay' should be paid out of total wages of Rs. 260, if they worked together for entire duration?Solution
Let the total work be 200 units {LCM (25 and 40)} So, efficiency of 'Akshay' = 200 ÷ 25 = 8 units/day And efficiency of 'Ben' = 200 ÷ 40 = 5 units/day So, share of 'Akshay' = 260 x (8/13) = Rs. 160
Two ladies simultaneously leave cities A and B connected by a straight road and travel towards each other. The first lady travels 3 km/hr faster...
A vehicle was scheduled to complete a 360 km journey in 6 hours. For the initial 4 hours, it maintained a steady speed of 56 km/h. At what minimum speed...
- A truck was moving at 50 km/hr and after ‘x’ hours it increased its speed by 15 km/hr. Then, it continued at the new speed for (x + 4) hours. If the di...
Buses A and B are moving around a circular ground of radius 420 m. If the speeds of the buses A and B are 12 m/sec and 15 m/sec respectively, then what ...
A,B and C run around a Circular track starting from the same point simultaneously and in the same direction at the speed of 8 kmph, 12 kmph and 16 kmph ...
A car traveling at a speed of 60 km/h covers a certain distance in 6 hours. If the car increases its speed by 20%, how much time will it save for the sa...
- A sphere has a diameter of 35 cm. Find its total surface area.
A train passes two people who are walking in the opposite direction of the train at the rates of 4 m/s and 10 m/sec in 12 seconds and 10 seconds respect...
A car's speed is 20% faster than that of a bike. The car takes 30 minutes longer than the bike to cover 120 km, while the bike covers 80 km. Find the ti...
On Diwali, a child Plants a bomb at a place and starts running at 60 m/s. After 58 seconds the bomb blasted. In how much time the sound of blast will be...