Question
βMβ is 60% more efficient than βNβ. βNβ
started the work alone and worked for 16 days and after that βNβ is replaced by βMβ. If the total work is completed in 45 days, find the time taken by βMβ to finish the same work alone?Solution
Let the efficiency of βNβ = β5xβ units/day Efficiency of βMβ = β8xβ units/day Time taken by βMβ to complete the remaining work = 45 β 16 = 29 days Total work = 16 Γ 5x + 29 Γ 8x = 312x units Desired time = 312x/8x = 39 days
A particle moving in a straight line with uniform acceleration covers distances 5 m, 9 m, and 13 m in the 1st, 2nd, and 3rd second of motion respectivel...
What is inertia?
A tuning fork of frequency 440 Hz resonates with a pipe closed at one end, vibrating in its second overtone . If the speed of sound in air is 330 m/s, w...
A projectile is fired at an angle ΞΈ and reaches maximum height H and range R. The angle between velocity and acceleration at the highest point is:
What will happen to the volume of ozone, when it is heated?
What is the wavelength of visible spectrum?
The unit of electric power is βΒ Β
What is the effect of a magnetic field on a current carrying conductor?Β Β
A beam of light consisting of two wavelengths, 600 nm and 420 nm, is used to obtain interference fringes in a Young’s double-slit experiment. Find...
What is the value of acceleration due to gravity at the center of the earth?