If 15 women or 18 men or 12 boys can do a piece of work in 18 days of 10 hours each, find how many boys assisted by 5 women and 6 men will finish the same work in 20 days of 6 hours each.
Given, 15 women = 18 men = 12 boys So 5 woman =4 boys & 6 men=4 boys Now by chain rule, M1D1H1 =M2D2H2 So 12boys×18×10 = (Tboys+5women+4man×20×6 12boys×18×10 = (T +4+4)boys ×20×6 18 = T+8 or T = 10 Hence, 10 boys more are required.
How much amount of Common salt should be given to the animal to fulfil its mineral requirement?
For manufacturing of packaged drinking water, basic requirement for the food business operators to obtain FSSAI license includes
The trade name of Alachlor is
Norin 10 is dwarfing gene of
What is the subsidized price of rice under Targeted Public Distribution System?
Cultivation of crops in areas receiving annual rainfall more than750 mm but less than 1150 mm is known as
Lumpi-Pro VacInd, a vaccine for Lumpy disease of cattle has been developed by ____
“Golden treasure” of Assam is known to which silk
In female reproductive system sperms are temporary stored at
Velamen is the multi-layered epidermis formed in the aerial roots of