Question
Ravi and Sita together can complete a piece of work in
150 days and 3 minutes, while Sita and Ramesh together can complete the same work in 90 days and 2.5 minutes. If the efficiency of Ramesh is 39.98% less than that of Sita, then find the approximate time taken by all three of them to complete 75% of the work together.Solution
ATQ Let the efficiency of Sita be '2y' units/day. So, the efficiency of Ramesh = 0.60 × 2y = '1.2y' units/day. So, total work = (2y + 1.2y) × 90 = '288y' units. So, combined efficiency of Ravi and Sita = (288y/150) = '1.92y' units/day. Therefore, required time = [(288y × 0.75) ÷ (2y + 1.2y)] = 60 days.
If the population kurtosis of the observations 16,12,6,2,4,10 is 1.7414, then population kurtosis of the 8,6,3,1,2,5 is
The variance of degenerate random variable is:

The interquartile range excludes ___ of the values.
The grouped data for the observation are as follows.
Class : 2-4 4-6 6-8<...
If the sum of lower and upper qualities is 6 and quartile deviation is 1.5, then the value of coefficient of quartile deviation is
If the occurrence of events follows Poisson Process with mean rate λ, then inter-occurrence time of events will follow:
The following observations 14, 19, 17, 20, 25 constitute a random sample from an unknown population with mean u and standard deviation σ.
The...
If the third quartile of the following data set 7,10,7,8,9 is 9.5, then the value of quartile deviation is:
The curve obtained by joining the points, whose x-coordinates are the upper limits of the class interval and y-coordinates are corresponding cumulative...