Question
Ravi and Sita together can complete a piece of work in
150 days and 3 minutes, while Sita and Ramesh together can complete the same work in 90 days and 2.5 minutes. If the efficiency of Ramesh is 39.98% less than that of Sita, then find the approximate time taken by all three of them to complete 75% of the work together.Solution
ATQ Let the efficiency of Sita be '2y' units/day. So, the efficiency of Ramesh = 0.60 Γ 2y = '1.2y' units/day. So, total work = (2y + 1.2y) Γ 90 = '288y' units. So, combined efficiency of Ravi and Sita = (288y/150) = '1.92y' units/day. Therefore, required time = [(288y Γ 0.75) Γ· (2y + 1.2y)] = 60 days.
A hybrid topology in networking is best defined as:
Telnet is a ......... based computer protocol ?
What is the name of the logic circuit which can add two binary digits
Which of the following address describes the dedicated location of a specific process (running program) or service in memory of a computer/server for re...
In a wireless network, which encryption standard provides the highest level of security?
The layer in the OSI model which is used for error detection and correction is ?
Which network device is used to connect different networks and forward data based on IP addresses?
How will you find out whether your computer has been hacked
Which key combination is the shortcut to maximize current window
The server on the internet is also known as ___________.Β