A, B and C can complete a work in 2 days. If A alone can
complete the same work in 6 days and B in 4 days, how long will it take for C to finish the work alone?Solution
ATQ: A + B + C = 2 A = 6 B = 4 Total work = 12 (LCM of 2, 6 and 4) A + B + C = 12/2 = 6 A = 12/6 = 2 B = 12/4 = 3 efficiency of C = (6 - (2 + 3)) = 1 Therefore, c will take 12/1 = 12 days
Statements:
V ≤ P < S = B; T < U ≤ I = B; N < J < T
Conclusions:
I. J > P
II. N < S
If 'A' means (+), 'B' means (-), 'C' means (÷), and 'D' means ( X ), then what is the value of the following expression?
124 A 248 C 31 B 15 D ...
In the following letter set, the second letter set is related to the first letter set in a certain way, find the letter set from the options which is r...
Which one of the given mathematical operations will result in 429?
Select the correct combination of mathematical signs that can sequentially replace the ‘*’ signs and balance the given equation.
12 * 8 * 42 ...
If ‘@’ denotes ‘addition’, ‘#’ denotes ‘subtraction’, ‘$’ denotes ‘multiplication’ and ‘%’ denotes ‘division’, then, wha...
- Interchanging which two signs will make the following equation correct?
15 + 3 × 9 – 4 ÷ 16 = 57 If ‘A’ means (÷), ‘B’ means (×), ‘C’ means (+), and ‘D’ means (-), then what is the value of the expression:
28 B 3 C 30 A 6 D ...
- If '+' means '-', ' X ' means '+', '-' means '÷' and '÷' means ' X ', then what is the value of the following expression?
32 ÷ 5 X 184 - 8 + 78 Given below an equation having four blanks you have to check from the alternatives which among the given is correct?
21 _ 51 _ 7 _ 12 _ 75