Question
A can complete a piece of work in 12 days and B can
complete the same work in 18 days. They work together for 4 days and then leave the remaining work to C, who finishes it in 6 days. In how many days can C alone complete the entire work?Solution
Assume total work = LCM of 12 and 18 = 36 units Aβs 1-day work = 36/12 = 3 units Bβs 1-day work = 36/18 = 2 units (A + B)βs 1-day work = 3 + 2 = 5 units Work done in first 4 days: = 5 Γ 4 = 20 units Remaining work = 36 β 20 = 16 units Let Cβs 1-day work = x units C finishes 16 units in 6 days: 6x = 16 x = 16/6 = 8/3 units per day Time taken by C to complete full work: = 36 / (8/3) = 36 Γ (3/8) = 108 / 8 = 13.5 days
Product of two consecutive positive even numbers is 840. Find the sum of the digits of the two numbers.Β Β
- Find the smallest perfect square that is divisible by 10, 14, 18, and 21. What is the remainder when it is divided by 85?
Find the smallest 3-digit number which when divided by 6, 8 and 9 leaves the same remainder 3 in each case.
The numbers are in the ratio 7:10:12. If (sum of smallest and largest) exceeds (sum of smallest and middle) by 30, find the largest number.
There are nine consecutive even numbers such that the smallest number is 20% less than the largest number. Find the sum of the second lowest and second ...
Find the smallest number which when divided by 8, 12 and 15 leaves a remainder of 5 in each case.
Find the remainder obtained when 34 Γ 46 Γ 52 is divided by 25.
The sum of a positive number 'A' and its square is 156. Find the value of (A2 - 7A).
Every day, 140 adults visit a park solely for walking. Additionally, 18% of the adults come exclusively to accompany their children, while 54% visit onl...
A student was required to calculate 9/20 of a number, but by mistake he calculated 11/20 of it. His answer exceeded the correct one by 65. Find the number.