Question
A can complete a piece of work in 12 days and B can
complete the same work in 18 days. They work together for 4 days and then leave the remaining work to C, who finishes it in 6 days. In how many days can C alone complete the entire work?Solution
Assume total work = LCM of 12 and 18 = 36 units A’s 1-day work = 36/12 = 3 units B’s 1-day work = 36/18 = 2 units (A + B)’s 1-day work = 3 + 2 = 5 units Work done in first 4 days: = 5 × 4 = 20 units Remaining work = 36 − 20 = 16 units Let C’s 1-day work = x units C finishes 16 units in 6 days: 6x = 16 x = 16/6 = 8/3 units per day Time taken by C to complete full work: = 36 / (8/3) = 36 × (3/8) = 108 / 8 = 13.5 days
When the electric impulse travels along the axon and reaches the other end called the synaptic terminal, this impulse triggers the release of
Consider the following statements regarding antibiotics
1. They are used to destroy disease-causing bacteria.
2. They can be applied to th...
What is the common name of calcium hydroxide?
Which element is the constituent of the chlorophyll molecule?
What is the acceleration of an object if it starts from rest and reaches a speed of 20 m/s in 5 seconds?

Which of the following is a conductor of electricity?
A potentiometer wire of length 1 m has a resistance of 5 Ω. It is connected to a 6 V battery in series with a resistance of 10 Ω. Determine the emf ...
Which of the following is not a property of electromagnetic waves?
The part of leaf by which it is attached to the stem is called ______.