Question
Ravi can complete a task alone in 12 days. After a few
days, Mohan joins him and both complete the remaining 50% of the work in 3 days. How long will Mohan alone take to complete the entire work?Solution
ATQ, Let the efficiency of Ravi be 'x' units/day. So, total work = 12 Γ x = 12x units So, work done by Ravi and Mohan together = 12x Γ 0.5 = 6x units So, combined efficiency = 6x Γ· 3 = 2x units/day So, efficiency of Mohan = 2x - x = x units/day So, required time = 12x Γ· x = 12 days
The Pointing vector of electromagnetic waves has the same dimensions as that of:
A train runs along an unbanked circular track of radius of 10 m at speed of 36 km/h. The mass of the train is 16 kg.
What is the an...
A potentiometer is an accurate and versatile device to make electrical measurements of E.M.F. because the method involves:
An ant can see objects all around it due to the presence of which type of eyes?
When a liquid is heated in a container, which of the following processes primarily causes the heat transfer within the liquid?Β Β
The apparent weight of a person in a lift moving downward with uniform acceleration is:Β
Which of the following correctly ranks molecular speeds at a fixed temperature?
Two blocks of masses 2 kg and 4 kg are connected by a light spring (k = 300 N/m) and placed on a smooth horizontal surface. The spring is compressed by ...
A string of length L is fixed at both ends. It supports a standing wave with 3 antinodes. If the speed of the wave on the string is v, what is the freq...
Two long parallel wires 2 cm apart carry 5 A and 3 A currents in the same direction. What is the force per unit length on one wire?