Question
25% of the work done by Arjun in 6 days equals 50% of
the work done by Karan in 3 days. If Arjun alone finishes the full work in 24 days, find the time Karan would take to complete the entire work alone.Solution
ATQ,
Let the efficiency of Arjun and Karan be x units/day and y units/day respectively.
So,
0.25 × x × 6 = 0.5 × y × 3
⇒ x = (3/1) × y
Total work = 24 × x = 24x units
Time taken by Karan = Total work / y = (24x) / y = (24 × 3y) / y = 72 days
With reference to the types of electromagnetic waves, consider the following statements:
(I) Radio waves have the highest wavelength range among ...
Quantum Theory was discovered byÂ
A storm is predicted if atmospheric pressure:
Sound and light waves both have ___________ .
What is the cause of hypermetropia?
Iron, Nickel and Cobalt are the examples of
Which element is known for its high electronegativity?
Which compound is used to prepare water proof clothes?
What Type of Mirror Is Commonly Used as Rear-View Mirrors in Vehicles?
A concave lens has a focal length 15 cm. If the object is placed at 30 cm from the lens, what is the image distance?