Question
Sneha and Meena can complete a project in 24 days and 60
days respectively. Sneha began working first. After how many days should Meena step in so that the project is completed in 20 days?Solution
ATQ,
Let the total work be 120 units (LCM of 24 and 60)
Efficiency of Sneha = (120 / 24) = 5 units/day
Efficiency of Meena = (120 / 60) = 2 units/day
Let Meena join after 'n' days.
So, 5n + (5 + 2) × (20 - n) = 120
⇒ 5n + 140 - 7n = 120
⇒ 2n = 20
⇒ n = 10
A person throws a ball from ground level at speed u and angle θ. The ball reaches maximum height H and range R. What is the ratio H/R?
Which of the following materials exhibits piezoelectric effect?
A particle moves in a circle of radius 10 cm with a constant speed. Its angular displacement after 2 seconds is π radians. What is its linear speed?
Which of the following is NOT a vector quantity? Â
The point where the total mass of a body is considered to be concentrated is known as what?
Ultrasonic pulse echo technique, a non-destructive ultrasonic testing, is employed for any possible flaw detection in a metallic bar of thickness 30 cm...
A positron is an anti-particle of an electron, having the same mass but opposite charge to electron. Then, the minimum energy released in annihilation ...
The mass and energy equivalent to 1 a.m.u. respectively are -
Two spherical soap bubbles of radii r1 and r2 coalesce to form a bubble of radius R. If surface tension of soap solution is T, atmospheric pressure is P...
Which of the following is the energy quantum of radiation?