A can complete a work in 40 days. B takes 20 days less than A to complete the same work. In how many days can both of them together complete 60% of the work together?
Time taken by B to complete the work = 40 – 20 = 20 days Let the total work = 40 units Efficiency of A = 40/40 = 1 units/day Efficiency of B = 40/20 = 2 units/day Required time taken = 0.60 x 40/(1+2) = 8 days
Gatiman express train crosses a platform in 23 seconds while it can cross a pole in 10 seconds. If the speed of the Gatiman express is 25 m/s, then find...
Ratio of the lengths of two trains ‘X’ and ‘Y’ is 6:7 respectively and the ratio of time taken by them to cross a pole is 4:5 respectively. If s...
A train 300 metre long takes 30 sec to cross a man running at a speed of 6 km/hr in the direction opposite to that of train. What is the speed of the tr...
Two trains C and D started from point A and B respectively. Speed of train D is 21 km/hr more than that of train C. Total distance between point A and B...
Train A running at speed of 144 km/hr crosses a platform having twice the length of train in 24 sec. Train B whose length is 800m crosses same platform ...
Two trains of same length are running in parallel tracks in the same direction with speed 50 km/hr and 80 km/hr respectively. The latter completely cros...
Two trains 190 metres and 140 metres in length are running towards each other on parallel tracks, one at the rate 60 km/hr and another at 48 km/hr. In h...
A train travels at an average speed of 100 km per hour without stoppage and with stoppages it covers the same distance at an average speed of 80 km/hr. ...
Two trains of length 200m and 160m respectively are running on parallel lines of rails. When running in the same direction the faster train passes the s...
Train B which is ‘d’ meter long can cross a pole in 35 seconds. Train A can cross a platform of (d+10) meter long in (t+45) seconds. The ratio betwe...