A + B = 15 days B + C = 20 days Work = L.C.M (15, 20) = 60 A + B = 4 B + C = 3 (A + B) × 3 + (B + C) × 8 + 12C = 60 4 × 3 + 3 × 8 + 12C = 60 12 + 24 + 12C = 60 12C = 60 – 36 12 C = 24 C = 2 Now, B + C = 3 B + 2 = 3 B = 1 ∴ B takes = 60/1 = 60 days