Question
A and B together can do a piece of work in 15 days which
B and C together can do in 20 days. After A has been working at it for 3 days and then by B for 11 days & then C finishes it in 20 days. In how many days B could finish the work?Solution
A + B = 15 days B + C = 20 days Work = L.C.M (15, 20) = 60 A + B = 4 B + C = 3 (A + B) × 3 + (B + C) × 8 + 12C = 60 4 × 3 + 3 × 8 + 12C = 60 12 + 24 + 12C = 60 12C = 60 – 36 12 C = 24 C = 2 Now, B + C = 3 B + 2 = 3 B = 1 ∴ B takes = 60/1 = 60 days
For preventing damage by shoot fly in sorghum the seed should be treated with
Which two new soil orders have been added in US Soil Taxonomy after 1975 ?
IADP was launched to have higher production of crops in the area of:
The incorrect combination of nutrient and deficiency symptom is
National Income means
Which of the following converts the reciprocating motion of the piston into rotary motion of the flywheel?
Krishi Vigyan Kendras are one of the largest networks for scientific dissemination of agricultural technologies to the end users financially supported by
Kranz anatomy is found in the leaves of
The ratio between C and N crop residue generally ranges between __ ?
Country which is pioneer in hybrid rice is