Question
A and B can do a piece of work in 12 days and 18 days,
respectively. They start working together, and after 4 days, A leaves the work. How many more days will B take to complete the remaining work?Solution
Rate of A = 1/12 per day, Rate of B = 1/18 per day. In 4 days, A and B together complete: (1/12 + 1/18) Γ 4 = (3 + 2) / 36 Γ 4 = 20 / 36 = 5/9 of the work. Remaining work = 1 - 5/9 = 4/9. B's rate is 1/18 per day. B will take: (4/9) / (1/18) = 4/9 Γ 18 = 8 days. Correct answer: d. 8 days
Tangents AB and AC are drawn to a circle from a point A, such that BAC = 400. A chord CP is drawn parallel to BA. The measure of ∠ CBP is...
Find the direction cosines of the plane 2x β 3y + 4z β 6 = 0 from the origin.
If f(0) = 3, f(1) = 5, f(3) = 21, then the unique polynomial of degree 2 or less using Newton divided difference interpolation will be:
In a β ABC, the bisectors of ∠ B and ∠ C meet at O. If ∠ BOC = 142°, then the measure of ∠ A is
For what value of do the simultaneous equations 2x+3y=1, 4x+6y = λ have infinite solutions?
PA and PB are two tangents from a point P outside the circle with centre O. If A and B are points on the circle such ∠APB = 128°, then ∠OAB ...
Ina circle with centre O, AD is a diameter and AC is a chord. B is a point on AC, such that OB = 5 cm and β OBA = 600 If β DOC = 60...
Find the equation of the plane with intercept 3 on the y-axis and parallel to ZOX plane.