Question
A and B can do a piece of work in 12 days and 18 days,
respectively. They start working together, and after 4 days, A leaves the work. How many more days will B take to complete the remaining work?Solution
Rate of A = 1/12 per day, Rate of B = 1/18 per day. In 4 days, A and B together complete: (1/12 + 1/18) × 4 = (3 + 2) / 36 × 4 = 20 / 36 = 5/9 of the work. Remaining work = 1 - 5/9 = 4/9. B's rate is 1/18 per day. B will take: (4/9) / (1/18) = 4/9 × 18 = 8 days. Correct answer: d. 8 days
A bag contains 7 (one rupee coins), 4 (two rupee coin) and 5 (ten rupee coin). Find the probability that 3 coins drawn at random are either (two rupee c...
In a bag, the ratio of yellow and orange marbles is 4:5 respectively, and the ratio of orange and purple marbles is 1:3 respectively. If the total numbe...
Two cards are drawn together from a pack of 52 cards. The probability that one is a club and one is a diamond?
A game consists of tossing three coins once and then rolling two dice. Find the probability of getting no heads in the coin toss and a sum equal to 4 on...
In a bag, there are 5 red balls, 6 green balls, and 9 blue balls. If two balls are drawn at random without replacement, what is the probability that bot...
In a factory which manufactures calculators, machines A, B and C manufacture respectively 25%, 35% and 40% of the calculators. Of their outputs, 5, 4 an...
Three Marbles and three balls are kept in a box. If two items are chosen at random, Find the probability that one is marble and another one is ball?
40 pens are there in a box where 22 are red pens, ‘p’ are blue pens and remaining are black pens. If a pen is picked, the probability of getting blu...
If the letter of the word Apples is arranged at random, what is the probability that all the vowels comes together?
A bag contains 8 black and 10 white balls. One ball is drawn at random. What is the probability that the ball drawn is white?
...