Question
A and B can do a piece of work in 12 days and 18 days,
respectively. They start working together, and after 4 days, A leaves the work. How many more days will B take to complete the remaining work?Solution
Rate of A = 1/12 per day, Rate of B = 1/18 per day. In 4 days, A and B together complete: (1/12 + 1/18) × 4 = (3 + 2) / 36 × 4 = 20 / 36 = 5/9 of the work. Remaining work = 1 - 5/9 = 4/9. B's rate is 1/18 per day. B will take: (4/9) / (1/18) = 4/9 × 18 = 8 days. Correct answer: d. 8 days
A hollow cylindrical container has an inner radius of 5.5 cm, a length of 15 cm, and a thickness of 3 cm. Calculate the volume of the container. (Use π...
If the total surface area of a cube is 486 cm², then calculate the volume of the cube.
Perimeter of a square field is 120 meters and the area of a rectangular field is 20% more than that of the square field. Find the area (in m2...
The cost of fencing a square plot @ Rs.16/m is Rs. 2304. What will be the cost of flooring the plot @ Rs. 3.5/ square m?
The lateral surface area of a cube is 400 cm2 . The length of a cuboid is 15% more than the side of the cube. The breadth of the cuboid is 6 ...
A man distributes 10%, 18% and 22% of his salary into his three children who spend 40%, 60% and 25% of that amount respectively. The difference between ...
The ratio of weights of two spheres of different materials is 8:17 and the ratio of the weights per same of materials of each is 289:64. The ratio of ra...
The measure of the two times of supplement of an angle is 40° less than 7 times the measure of the complement of the same angle. Find the measures of t...
The sum of the perimeters of a square and a rectangle is 118 metres. If the sum of the length and breadth of the rectangle is 31 cm, then find the area ...
A right circular cylinder having total surface area of 2710.4 cm2 is immersed in a vessel completely filled with water. If the height of the ...