'A' and 'D' together can finish a project in 40 days. If
'D' alone can complete 25% of the project in 15 days, then find out how long it takes for 'A' alone to finish the project.Solution
ATQ, Time taken by 'D' to complete the project alone = 15 × (100/25) = 60 days Let the total work be 120 units. {LCM (40 and 60)} Efficiency of 'A' and 'D' together = (120/40) = 3 units/day Efficiency of 'D' = (120/60) = 2 units/day Efficiency of 'A' = 3 - 2 = 1 unit/day Time taken by 'A' to complete the work alone = (120/1) = 120 days
Which of the following words is the most opposite in meaning to the word ‘ depleting’ as used in the passage ?
What do the results of ‘The Social Attitude Research India’ survey reveal?
What was Shahid suffering from?
What is according to the passage what efforts used to combat poverty ?
What is the meaning of ‘cannot feign surprise’ as used in the passage?
What is the most egregious failure with respect to the prevailing situation in Maldives?
Which of the following is likely to co-exist?Â
Which of the following words seems the most opposite in meaning to the word 'mend' s used in the passage?
Replace the word against number 26 with the correct option from the given options below:
The Army too opposed the embankment, saying it will pose hurdles for their forward movements during military operations.