Question
A, B, and C together wrap up a task in 14 days. B and C
together can finish it in (280/18) days, and C alone completes half in 14 days. Find the ratio of the efficiency of A to B.Solution
1/A + 1/B + 1/C = 1/14 C alone complete the whole work = 14 Γ 2 = 28 days B and C together = (280/18) days β rate = 18/280 = 9/140 1/A = 1/14 β 9/140 = (10 β 9)/140 = 1/140 1/B = 9/140 β 1/28 = (9 β 5)/140 = 4/140 = 1/35 A alone complete the work = 140 days B alone complete the work = 35 days Required ratio = (1/140) : (1/35) = 1 : 4
What is a "page fault" in the context of virtual memory?
The result evaluating the postfix expression 10 5 + 60 6/ * 8 β is
What is the purpose of the subnet mask in IP addressing?
What does PHP stand for?
How does blockchain achieve its tamper-resistant quality?
Which of the following is an example of two-factor authentication?
Which of the following tasks is not typically performed by a lexer?
What is the purpose of the "HAVING" clause in an SQL query?
Which routing algorithm is commonly used in the network layer to calculate the shortest path between network nodes?
Which scheduling policy aims to minimize the average waiting time?