Question
Sonal completed 30% of work alone and left the remaining
work for Vinod who completed it in 28 days. If the total work got completed in 40 days, then find the time taken by Sonal and Vinod together to complete the whole work.Solution
Total time taken by Vinod alone to complete the work = (28/7) x 10 = 40 days Total time taken by Sonal alone to complete the work = (12/3) x 10 = 40 days Let total work be 40 units. Hence, the Required time will be = 40/2 = 20 days
Two wires A and B are made of the same material and have the same length but different cross-sectional areas. If the resistance of wire A is 9 times the...
- Six cubes each of side 5 cm are attached end to end to form a cuboid. Find the total surface area of the cuboid.
Given that a cylinder has a curved surface area of 880 cm² and a radius of 10 cm, calculate the volume of the cylinder.
The total surface area of a cylinder is 2,200 cm². If its radius is 7 cm and height is expressed as (k + 13), then find the value of ‘k²’. (Use π...
If the base and height of a triangle are in the ratio of 2:5 and area is 125 cm2. Find its base and height.
In what time would a Cistern be filled by three pipes whose diameter are 2cm, 8/3 cm and 4cm running together, where the largest pipe alone fill it in 1...
If a six digit number 3x 7z 8y is divisible by 7, 11, 13, then the average value of x, y, z is:
- A wheel goes 7920 metres in 90 rounds. What will be the diameter of that wheel? (Use π = 22/7)
A sphere has a volume of 121.5Ï€ cm3. Find its radius.