Question
Sonal completed 30% of work alone and left the remaining
work for Vinod who completed it in 28 days. If the total work got completed in 40 days, then find the time taken by Sonal and Vinod together to complete the whole work.Solution
Total time taken by Vinod alone to complete the work = (28/7) x 10 = 40 days Total time taken by Sonal alone to complete the work = (12/3) x 10 = 40 days Let total work be 40 units. Hence, the Required time will be = 40/2 = 20 days
A solid right circular cylinder is melted and shaped into a right cone with a base of equal radius. By what percent is the length of the solid increased?
A cuboid has its dimensions in the ratio 2:1:3. If the volume of the cuboid is 3072 cm³, calculate the sum of its dimensions.
The sides of a triangular park are 96 m, 110 m and 146 m. Its area is equal to the area of a field in the shape of a rhombus, one of whose diagonals is...
The radius of the base of a cylindrical tank is 5 metres. If eight times the sum of the areas of its two circular faces is four t...
The perimeter of a rectangular field is 480 meters and the ratio between the length and breadth is 5:3. The area of the field is:
In a zoo, 30% of the people are males. 50% of the remaining are females and the remaining 630 are children. Find the total number of people in a zoo.
The difference between the area of a circle and the area of the rectangle is 290.16 cm2. If the length of rectangle is 25% more and breadth i...
The radius of a circle is 7 cm. (Take π = 22/7.) What is the area of the circle?
- A rectangular swimming pool has a base area of 1200 m², and the volume of water in the pool is 48000 m³. Calculate the depth of the water in the pool.
If the area of a triangle is 1014 cm2 and base: corresponding altitude is 3:4, then the altitude of the triangle is: