Virat can do a piece of work in 20 days and Sachin can do the same work in 30 days. If Virat works for 4 days and got Rs. 2400, and the remaining work will completed by Sachin, then how much rupee Sachin earned?
Assume total work = LCM (20, 30) = 60 If the entire work is 60 units, Virat can complete 3 unit per day, and Sachin can complete 2 unit per days In 4 days, Virat completes 12 units and got Rs.2400 i.e. Rs.200 per unit. Remaining work = (60 – 12)unit = 48 unit ∴ Sachin earning = Rs.48 × 200 = Rs. 9600
A telecommunications network which allows computers to exchange data is known as
What type of operating system switches tasks based on their priorities or external events?
To access the services of the operating system, the interface is provided by the______
What are the horizontal and vertical lines on a worksheet called?
An object embedded in a web page or email, which unobtrusively (usually invisibly) allows checking that a user has accessed the content is called
In the OSI model, which layer is responsible for end-to-end communication and error recovery?
The device which store information and are used by the computer for its working are called
One should click ___________ , in order to move from one worksheet to another in MS-Excel workbook.
Which of the following is a volatile storage device?
ICT stands for