Question
Virat can do a piece of work in 20 days and Sachin can
do the same work in 30 days. If Virat works for 4 days and got Rs. 2400, and the remaining work will completed by Sachin, then how much rupee Sachin earned?Solution
Assume total work = LCM (20, 30) = 60 If the entire work is 60 units, Virat can complete 3 unit per day, and Sachin can complete 2 unit per days In 4 days, Virat completes 12 units and got Rs.2400 i.e. Rs.200 per unit. Remaining work = (60 – 12)unit = 48 unit ∴ Sachin earning = Rs.48 × 200 = Rs. 9600
- Meera noticed the sound of fireworks from a distance of 2.1 kilometers, reaching her after 24 seconds. Find out the speed of the sound.
The diameter of a wheel W is 63 cm. It completes 1000 rotations in 1 minute. Find the speed of the vehicle.
Ram needs to cover a certain distance to reach his destination. When he drives at a constant speed of 24 km/h, he arrives 2 hours later than planned. Ho...
A bike moving at a speed of 240 km/h takes 5 hours to reach the fuel station. If the target must be reached within 80 minutes, at...
Karan and Varun started running in a straight line at 5 m/s and 7.5 m/s respectively. If Karan started 90 meters ahead of Varun, ...
A bicycle moves at 30 km/h and needs 9 hours to complete a journey. A van completes the same journey in 3 hours. If the bicycle's speed is increased by ...
A boy can swim a certain distance downstream in 5 hours and return in 7 hours. If the rate of stream is 4 kmph then what is the speed of boy in still wa...
A boy goes to school with a speed of 75 km/h and comes back with a speed of 45 km/h. find his average speed?
A, B, and C are working together on a project. A can complete the project alone in 15 days, B in 20 days, and C in 30 days. On the first day, A, B, and ...
A Scooty is currently traveling at a speed of (2a – 90) km/hr, and a Bus is moving at a speed of (b + 30) km/hr. If the Scooty's speed were equal to t...